View the sitemap for this website below, with links to each of the pages and brief descriptions of what to find in each section
Blog posts
- 13. Gearbox clean and fit. Home Powder Coating. Engine loom. Inlet Plenum Mods. Making the Fuel Tank, Cooling plumbing.
- 12. Suspension, AirCon, Brakes, Flocking, ICE
- 11. Chassis finished and assembly begins
- 10. NACA Duct, Badge, GRP Mirror Mouldings, Hubs, Door Latches, Sliding Windows.
- 9. Chassis Prep, Air Con choice, Oil Pan Mods, Seat Belt Mountings, Fitting Headlamps and Headlamp Covers with Nut-plates, Nose GRP mods and prep.
- 7. Continuing with body mods